						Customer: 
								Teixeira Duarte
							
                            	Local: 
								Tizi-Ouzou - Thenia								 - Algeria															
Year: 
								2015							
Work done: 
								Reinforced concrete structure  							
Concrete: 
							23.400 m3 							
Formwork: 
								38.250 m2							
Shoring: 
								38.000							
Intervention area: 
								Transport Infrastructures 
							
							
The contract consists of the construction of a small bridge and two viaducts inserted in the railway line that will connect Thenia and Tizi-Ouzou.
Viaduct at km 29+005:
The viaduct has a length of 660m and FCM has executed the foundations, the abutment and the pillars, the decks are composed of a mixt structure (metal + reinforced concrete).
Viaduct at km 36+600:
The viaduct has a length of 750m and is composed of a metallic deck of around 500m, where FCM executed the foundations and pillars. For the remaining 250m, the deck is made of reinforced concrete and the viaduct has the form of a roman-bridge, with the arches and the respective decks executed with a falsework.