 
						Customer: 
								Construtora Andrade Gutierrez
							
                            	Local: 
								Constantine 								 - Algeria															
Year: 
								2015							
Work done: 
								Reinforced concrete structure   							
Concrete: 
							7.000 m3 							
Formwork: 
								18.000 m2							
Shoring: 
								83.000 m³							
Intervention area: 
								Transport Infrastructures 
							
							
The construction of the Transrhumel viaduct was considered the most important achievement of the city of Constantine since the independence. This viaduct is already considered the "eighth wonder" of the city with seven bridges. With a length of 1119m, the viaduct has a futuristic design, which modernized the urban configuration of the city. The contract consisted of the execution of the supported sections of the Main Viaduct. In addition, a viaduct and an access ramp to the south of the main viaduct were executed. It also contemplated the execution of several retaining walls in the vicinity of the main viaduct.