António Gedeão Secondary School Gymnasium

Customer:
Município de Odivelas

Local:
Odivelas - Lisboa - Portugal

Year:
2017

Work done:
General Construction

Building area:
612 m2

Deadline:
6 months

Intervention area:
Public Buildings


A contract for the construction of a gymnasium of a school. It included concrete structure, metal structure, pavement, sports equipment, finishes and special installations.

The building consists of two blocks, differentiated by its height, one with a height of 2.80m, corresponding to the showers/changing rooms and the other with 7.00m height, corresponding to the playing area. The entrance is made by the lower body, with direct access to the changing rooms of the students, separated by sex, to the teacher's room and its showers and to an adapted sanitary installation.

The play area, with a size of 24.70x16.00m, allowed the deployment of a basketball court, two mini basketball courts, three badminton courts, a volleyball court and a tennis court. The play area has a store room with about 36 m2.